In addition to paying attention to copper wire drawing oil, what should we pay attention to?
- Categories:Industry News
- Author:
- Origin:
- Time of issue:2022-12-30 13:21
- Views:
(Summary description)Turn on the wire extension liquid switch, and check whether the liquid injection volume of each nozzle is sufficient and the position is appropriate.
In addition to paying attention to copper wire drawing oil, what should we pay attention to?
(Summary description)Turn on the wire extension liquid switch, and check whether the liquid injection volume of each nozzle is sufficient and the position is appropriate.
- Categories:Industry News
- Author:
- Origin:
- Time of issue:2022-12-30 13:21
- Views:
1. Turn on the wire extension liquid switch, and check whether the liquid injection volume of each nozzle is sufficient and the position is appropriate.
2. In the process of threading and winding, open the wire drawing liquid nozzle in turn. The empty mold winding operation 1 shall, according to the specification requirements specified in the process card, check the List of Eye Mold Arrays and notify the PQC personnel to collect the molds, and place them in the eye mold base in turn according to the list of eye mold rows. 2 Thread the wire into the machine after passing through the wire guide wheel of the pay off frame, and then start the threading operation.
3. Pull the bus with the left hand, hold the sharp nose pliers with the right hand, and step on the inching pedal for threading the lead.
4. When threading the mold, pull off the bus first, and then use pliers to clamp the broken neck (3-6mm) to pass through the eye mold. When threading the mold, pay attention to threading from one side of the circle, and do not reverse threading.
5. After passing through the eye mold, the standard operation of winding on the tower wheel is controlled as follows: (0.72-0.60) winding three times (0.55-0.175) winding two times less than 0.16
6. After the wire passes through the outlet mold through the tower wheel and eye mold seat at all levels, the eye mold cover shall be tightly covered and the disconnect switch shall be pressed on the wire.
7. When the wire is pulled through the take-up pulley and the three groove guide pulley, the wire can be wound for 1-2 turns according to different specifications, and then the wire head can be fixed on the iron shaft through the tension pulley and the flat pulley. The flat cable 1 shall be flexible in operation, and lubricating oil shall be added once a week. If it is damaged, it shall be replaced in time. 2 According to the inner width of the take-up reel, preliminarily adjust the round-trip travel position of the winding guide wheel, and then accurately adjust the winding width after the standby platform is turned to 2000m/min.